The startup and commissioning (testing) procedure is done once the technique is completely mounted and ready to run. The technique is turned on and have to run for fifteen-20 minutes. This will allow the refrigerant to circulation with the technique and begin the air conditioning course of action. Affix the https://tysonoa8e9.blog4youth.com/32933170/details-fiction-and-air-conditioning-installation