To begin with, the Jai Hind metro station was planned to generally be elevated. Nevertheless, the AAI objected the elevated stretch up on the airport could pose a menace to plane, Hence the route was even more reworked as well as the station was shifted underground, 150 m with the Airport https://marcoocjqz.blog4youth.com/33527514/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf